Storefront & commercial glass in Hialeah. A clear front for your business.
Project-specific glass for commercial glazing contractors, installers and construction teams. Coordinate your storefront, entrance or tenant improvement with Lumma Glass in South Florida.
A successful commercial opening brings together glass, framing, hardware, seals and installation details. Send the specified system and your project drawings so we can review the glass scope.
01 / RETAIL
Storefront glazing
Coordinate fixed vision panels, sidelites and transoms for shops, showrooms and street-facing commercial spaces. Identify opening marks, frame pockets and the specified glass make-up before releasing dimensions.
Share elevations and the glazing schedule.
02 / ACCESS
Commercial entrances
Door glazing must match the entrance system and hardware requirements. Coordinate door swing, pivots, locks, closers and adjacent sidelites with the responsible installer.
Share door schedules and hardware details.
03 / INTERIORS
Office partitions
Interior glazing can bring daylight and visual connection to meeting rooms and work areas. Define privacy, sound control and support details for the complete partition.
Share room use and acoustic targets.
04 / RENOVATION
Tenant improvements
For remodels and replacement panels, document existing framing and field conditions. Similar appearance does not confirm an equivalent glass configuration or compatible replacement.
Share field measurements and photographs.
Storefront or curtain wall?
Use the system named in the project documents. Storefront and curtain-wall products have distinct framing, anchorage, movement and drainage details; they are not interchangeable simply because both use glass and aluminum. For larger facade scopes, submit the designer’s system selection and manufacturer details. [7]
MODERN GLAZING. DOCUMENTED PERFORMANCE.
Look beyond the glass color.
Discuss the priorities for your building, then confirm availability and compatibility with the specified assembly. Industry options below are specification topics, not a stock catalog.
Low-emissivity coatings and insulating glass can support thermal and solar-control goals. Compare U-factor, solar heat gain coefficient and visible transmittance for the proposed configuration; distinguish center-of-glass data from whole-product ratings. [4]
Balance daylight, heat gain and the desired appearance.
Thermal breaks and compatible door-and-frame designs address heat flow through aluminum components. Evaluate the entrance and adjacent framing together so an efficient glass choice is supported by the complete system. [2]
Request the specified system’s thermal documentation.
Acoustic interlayers can improve sound damping. Actual separation also depends on frames, door seals and flanking paths. Review documented assembly results against the traffic or interior noise you need to address. [6]
Specify an assembly target rather than glass thickness alone.
Confirm sill, flashing, drainage and perimeter-seal details with the installer and system manufacturer. Product-control documentation may require adhesive compatibility evidence for a particular glazing assembly. [5]
Keep approved drainage paths and material combinations intact.
For exterior impact-rated work, provide the applicable NOA or Florida Product Approval and required design pressures. Verify glass options, panel limits, mullions, anchors and installation conditions against the approved documents. [1]
Laminated glass alone does not establish hurricane approval.
Coordinate safety glazing with the project’s required locations. Accessible entrance design also includes clearances, thresholds, maneuvering space and operable hardware; glass selection alone cannot establish entrance compliance. [3]
Have the design and installation teams confirm the complete opening.
For a detailed explanation of glass treatments and interlayers, see our Tempered & Laminated Glass guide. Final selections follow project engineering, applicable requirements and manufacturer documentation.
FROM ELEVATION TO PANEL SCHEDULE
Make your commercial RFQ ready for review.
Give every opening a reference. Clear project information helps separate glass fabrication from framing, hardware and installation responsibilities.
Identify the projectCompany, site city, building use, new construction or renovation, and your requested scope.
Define the systemFrame manufacturer and series, glass pockets, approved assembly documents and design pressures where applicable.
Schedule the panelsOpening marks, quantities, finished sizes with units, glass make-up, coatings, edgework and cut-outs.
Coordinate entrancesDoor marks, hardware, handing, sidelites, transoms and accessibility requirements.
Control revisions & logisticsDrawing revision, measurement responsibility, target date, packaging needs and pickup or delivery request.
Send the opening mark, dimensions, frame details, photographs and existing glass specification. Confirm field measurements and the permitted replacement configuration before fabrication; visual matching alone is insufficient.
YOUR SOUTH FLORIDA GLASS FABRICATION PARTNER
Hialeah-based. Connected to your job site.
Request storefront and commercial glass for commercial projects in Hialeah, Doral, Miami Lakes and Miami, with project coordination across Miami-Dade and Broward. Share your site location and schedule so our team can confirm logistics.
Get the information needed to start a project-specific conversation.
Does Lumma Glass install storefront systems?
This page addresses glass supply and fabrication RFQs. Describe your requested scope so the team can confirm what is available. Framing, installation, permitting and engineering responsibilities should be agreed separately with the appropriate project professionals.
What do you need to quote commercial storefront glass?
Send project location, opening elevations, panel quantities, finished sizes and units, glass make-up, frame system and target date. Include approval documents and required design pressures for applicable exterior work.
Can I replace storefront glass with a different thickness?
Do not substitute based on appearance or thickness alone. The replacement must suit the frame, support conditions, safety requirements and approved assembly. Send the existing specification and project documentation for review.
Do you supply glass for Miami-Dade and Broward projects?
Our Hialeah location supports quote coordination for commercial buyers across Miami-Dade and Broward, including Hialeah, Doral, Miami Lakes and Miami. Contact us with the job-site location to confirm order logistics.
Is all storefront glass impact-rated?
No. Impact resistance is established by the tested and approved assembly. Its glass make-up, frame, dimensions, anchors and installation conditions must match the applicable approval and project requirements.
Can you match existing storefront glass?
Provide daylight photographs, the original glass designation, coating or tint information, thickness and a sample if available. The team must confirm options; photographs cannot guarantee an exact visual match.
How are plans submitted with the quote request?
The form prepares a message to sales@lummaglass.com for you to review in your email app. Selected filenames appear in the message; attach the actual files manually before sending.
How soon can my commercial order be ready?
Availability and timing depend on the final glass specification, quantity and fabrication details. Share your target date and request confirmation before committing to a project schedule.
Technical sources & further reading
Reviewed October 5, 2026. Industry references describe specification considerations; manufacturer examples do not establish Lumma Glass inventory or certifications.